Steel Frame Preparation — New Build Commercial, Northampton
About This Project
A new commercial development at Northampton Gateway required all structural steelwork to be shot blasted and primed before erection on site. Processing the steel off-site in our facility is significantly more efficient than on-site blasting and ensures a consistent, controlled finish. Our team processed the entire frame package — columns, beams, bracing and connections — to SA 2.5 standard, applied a zinc phosphate primer, and delivered the primed steelwork to site on schedule.